Sanno Park Tower 12F (Reception) and 14F,
11-1, Nagatacho 2-chome, Chiyoda-ku,
Tokyo 100-6114, Japan

Tokyo Metro Ginza Line: G06 Tameike-sanno Station, Exit 7 (directly accessible through the second basement)

Tokyo Metro Nanboku Line: N06 Tameike-sanno Station, Exit 7 (directly accessible through the second basement)

Tokyo Metro Chiyoda Line: C07 Kokkai-gijido-mae Station, Exit 5 (3 minutes’ walk)

Tokyo Metro Marunouchi Line: M14 Kokkai-gijido-mae Station, Exit 5 (10 minutes’ walk through Chiyoda Line platform)

News

An article titled, “Laws Governing Biomass/Waste Power Generation Business (Overview) – Part 3: Regulations That Can Be Hurdles as Environmental Restrictions (upon Launch and in Operation),” written by Kenji Sarukura, Akane Ueda and Kota Kato, was posted on “BUSINESS LAWYERS.”

1. Introduction

(1) What is biomass

(2) Laws and regulations governing biomass power generation business

2. Regulations that can be hurdles as environmental restrictions (upon launch as well as in operation)

(1) Act on Special Measures against Dioxins

(2) Air Pollution Control Act

(3) Noise Regulation Act

(4) Vibration Regulation Act

(5) Act on Improvement of Pollution Prevention Systems in Specified Factories

(6) Water Pollution Prevention Act

(7) Offensive Odor Control Act

(8) Sewerage Act

3. At the end

https://www.businesslawyers.jp/articles/1296