Sanno Park Tower 12F (Reception) and 14F,
11-1, Nagatacho 2-chome, Chiyoda-ku,
Tokyo 100-6114, Japan

Tokyo Metro Ginza Line: G06 Tameike-sanno Station, Exit 7 (directly accessible through the second basement)

Tokyo Metro Nanboku Line: N06 Tameike-sanno Station, Exit 7 (directly accessible through the second basement)

Tokyo Metro Chiyoda Line: C07 Kokkai-gijido-mae Station, Exit 5 (3 minutes’ walk)

Tokyo Metro Marunouchi Line: M14 Kokkai-gijido-mae Station, Exit 5 (10 minutes’ walk through Chiyoda Line platform)

News

An article titled, “Laws Governing Biomass/Waste Power Generation Business (Overview) – Part 2: Regulations That Can Be Hurdles When Operating Biomass Power Generation Facilities,” written by Kenji Sarukura, Akane Ueda and Kota Kato, was posted on “BUSINESS LAWYERS.”

1. Introduction

2. Regulations that can be hurdles when operating biomass power generation facilities

(1) Act on Special Measures for Promoting the Utilization of Electricity from Renewable Energy Sources (Renewable Energy Special Measures Act)

(2) Industrial Safety and Health Act

(3) Fire Service Act

(4) High Pressure Gas Safety Act

(5) Act on Waste Management and Public Cleaning (Waste Cleaning Act)

3. At the end

https://www.businesslawyers.jp/articles/1295